Halilu, Arfansyah A. (2018) ANALISIS PENERAPAN MENAJEMEN WAKTU PADA PROYEK KONTRUKSI JALAN DENGAN METODE PERT (STUDI KASUS PT. START MITRA SULAWESI). Undergraduate thesis, UNIVERSITAS SINTUWU MAROSO.
Full text not available from this repository.Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Perpustakaan UNSIMAR |
Date Deposited: | 19 Mar 2020 03:07 |
Last Modified: | 19 Mar 2020 03:07 |
URI: | http://repository.unsimar.ac.id/id/eprint/514 |
Actions (login required)
View Item |
Downloads
Downloads per month over past year